- Start of operation of the drinking water supply system: 2001
- Start of operation of the wastewater treatment and water reuse production system: 2011
- System capacities: 15,000 m³/month of drinking water and 6,000 m³/month of water reuse
- Water reuse production technology: MBR with flat-sheet membranes and Reverse Osmosis