World Trade Center São Paulo

  • Start of operation of the drinking water supply system: 2001
  • Start of operation of the wastewater treatment and water reuse production system: 2011
  • System capacities: 15,000 m³/month of drinking water and 6,000 m³/month of water reuse
  • Water reuse production technology: MBR with flat-sheet membranes and Reverse Osmosis